- CSLB Licensed #268555 • C-21 & C-12
Expert Mobile Home Demolition & Site Clearance in Yuba City
- 2–4 Day Lot Turnaround
- 100% Turnkey Permitting
- Owner-Operated Fleet






- Logistics Services & Site Clearance
Comprehensive Mobile Home Teardown & Lot Reclamation Services
Single-Wide Mobile Home Demolition (Up to 14' × 70')
We provide systematic, rapid dismantling of single-wide manufactured units and vintage trailers. Our crew strips exterior aluminum siding, separates the timber and fiberglass superstructures, and unbolts longitudinal structural steel I-beams. We extract all ground tie-down anchors, remove stabilizing concrete cinder piers, and perform a high-powered magnetic nail sweep to leave your ground safe and ready for use.
Double-Wide & Triple-Wide Multi-Section Teardowns (24' to 36'+ Width)
Multi-section manufactured homes require specialized mechanical separation at marriage lines and structural ridge beams. We utilize heavy-duty hydraulic rotating grapples to crush and collapse roof trusses, subfloor framing, and drywall without scattering airborne debris across neighboring parcels. Our scope includes the complete demolition of attached carports, wooden awnings, screened porches, and skirting assemblies.
Concrete Foundation, Runner Pad & Slab Pulverization
Many older manufactured homes sit on poured concrete runner footings, perimeter stems, or full 4"–8" monolithic concrete pads. Using an Indeco HP 3000 hydraulic breaker attachment mounted to our 20-ton excavator, we fracture and pulverize reinforced concrete foundations. We sever rebar with hydraulic shears, excavate subsurface footings, haul concrete to certified Recology crushing facilities, and laser-grade the soil back to natural contours.
Abandoned & Fire-Damaged Trailer Hazard Removal
Fire-damaged mobile structures present extreme health and structural collapse hazards. We coordinate emergency lot clearances, hazardous ash containment, and structural wreckage hauling in strict compliance with the Feather River Air Quality Management District (FRAQMD) Rule 3.14 and Rule 3.15. We safely clear burned frames, twisted metal roofing, and contaminated soil before seasonal rains cause toxic runoff into local drainage swales.
Utility Line Safe Capping & Septic Disconnect Coordination
Before heavy machinery makes contact with the structure, all live services must be safely terminated. We coordinate PG&E electric and natural gas service cut-offs, cap municipal water meters, and disconnect private well supply lines. For rural parcels in Sutter and Yuba Counties, we locate and cleanly cap 4" PVC sewer lateral connections or septic tank inlet bungs to prevent tank collapse under heavy machinery loads.
- Logistics Services & Site Clearance
2026 Transparent Mobile Home Demolition Cost Breakdown
Single-Wide Teardown
$3,500 – $5,500
avg. total · 1 to 2 Days
- Ideal for 10'–14' wide units up to 70' in length
- Superstructure mechanized teardown using a Komatsu PC210LC excavator with rotating demolition grapple.
- Longitudinal steel chassis and outrigger shearing, sorting, and scrap metal diversion.
- Skirting removal, pier block stacking, and tie-down strap extraction.
- Skirting removal, pier block stacking, and tie-down strap extraction.
- Debris loading and transport to Recology Yuba-Sutter Ostrom Road Landfill.
- High-strength magnetic roller sweep for nails, screws, and metal shards.
- Conforms with City of Yuba City Municipal Code Section 7.08.040 for residential structure demolition.
- MOST COMMON
Double-Wide Teardown
$5,500 – $9,000
avg. total · 2 to 3 Days
- Ideal for 24'–32' wide units up to 65' in length
- Marriage-line separation using a Stihl TS 800 cut-off saw with diamond metal blade to decouple galvanized ridge plates.
- Full collapse of ceiling trusses, composition shingle roof, plywood subflooring, and vinyl/aluminum siding.
- Demolition and removal of attached carports, sunrooms, front decks, and perimeter wooden skirting.
- PG&E utility disconnect verification and sewer lateral mechanical plug installation.
- Submittal and approval of all permit documents through the Sutter County eTRAKiT Permit Portal under Ordinance 1520.
Turnkey Package + Slab
$8,500 – $16,000
avg. total · 3 to 4 Days on Site
- Complete single or double-wide teardown plus removal of underlying concrete foundations (runners or slab).
- Indeco HP 3000 hydraulic breaker pulverization of 4"–8" rebar-reinforced concrete slabs.
- Concrete debris hauling to local clean-fill recycling facilities (diverting landfill tonnage fees).
- Subsurface utility trench locating, septic tank isolation, and deep hole backfill.
- Final rough grading and site stabilization using a Spectra Precision GL422N dual-grade laser level for immediate new home foundation or pad construction.
25+
Years Heavy Machinery Experience
100%
Yuba City & Sutter Permit Approval
2–4
Day Complete Lot Turnaround
0%
Subcontractor Markup
- Code Compliance
Engineered Demolition & Environmental Code Compliance
Air Quality Clearance:
Prior to disturbing materials manufactured before 1985, we facilitate accredited asbestos sampling under Feather River Air Quality Management District (FRAQMD) Rule 3.14/3.15, ensuring complete environmental sign-off.
State Title & Tax Clearance:
We guide landowners through California Department of Housing and Community Development (HCD) Form 433A / Form 433B filings to officially deregister the mobile home title from Sutter County tax rolls, eliminating ongoing property tax assessments on non-existent structures.
Heavy Mechanical Execution:
We deploy commercial-grade excavators and dust-suppression water misting to contain particulate matter, ensuring surrounding orchards and residential neighbors remain undisturbed.
Certified Landfill Diversion:
All structural waste is sorted on-site to extract recyclable steel chassis, copper wiring, and concrete aggregate, maximizing C&D waste diversion mandates under California CalGreen standards.
- Our Process
Our 4-Step Mobile Home Teardown & Lot Clearing Process
01
On-Site Inspection & Utility Audit
We visit your parcel in Yuba City, Marysville, or surrounding rural acreage to evaluate machine access, measure unit dimensions, inspect foundation types (piers vs concrete slab), and verify PG&E power and water shutoff locations.
02
Permitting, Asbestos & HCD Paperwork
We pull all required building and demolition permits via Sutter County eTRAKiT or City of Yuba City Development Services. We verify FRAQMD air district notifications and prepare state HCD title deregistration records.
03
Excavator Demolition & Scrap Sorting
Our 20-ton excavator crew arrives on schedule. Using precision grapples & hydraulic shears, we dismantle the structure, crush debris into high-capacity roll-off trucks, salvage recyclable steel frames & pulverize concrete footings.
04
Magnetic Sweep, Laser Grading & Final Sign-Off
We run heavy industrial magnetic sweeps across the entire work zone to pull every nail and screw from the soil. We laser-grade the parcel to prevent standing water, secure final building inspector sign-off, and leave you with a clean, build-ready lot.
- Yuba-Sutter Region
Serving All of Sutter County, Yuba County & the North Valley
Sutter County
- Yuba City
- Live Oak
- Sutter
- Nicolaus
- Pleasant Grove
- Meridian
- Robbins
Yuba County
- Marysville
- Olivehurst
- Linda
- Plumas Lake
- Browns Valley
- Loma Rica
- Smartsville
Foothills
- Oroville
- Thermalito
- Palermo
- Magalia
- Penn Valley
- Lakeport
- Ready to Get Started?
Reclaim Your Property Today
Get a Flat-Rate Demolition Quote
- Got Questions?